After
the 0615 cleaning station inspections, cadets ate breakfast
and reported for the 0730 formation. After formation,
cadets started maintenance on deck. The sound of
needle guns can be heard throughout the ship as cadets
needle gun the flybridge and work their way down.
Engine cadets are working in the chief
engineer's cabin fixing a leak in an overhead pipe which has
caused his cabin to become extremely wet.
Cadets were not able to shoot stars
this morning because of overcast skies. Currently the
weather is 68°
with overcast skies, and a 3' to 4' following sea.
This evening, cadets will be
preparing their cabins and uniforms for the weekly
cabin/personnel inspection on Saturday. After cleaning
stations are inspected, cadets will have a personnel
inspection at 0730 in the morning. At 1000 a fire and
boat drill will be held in which cadets/crew will don their
survival suits during the boat drill. At 1100,
emergency steering gear drill will commence. The
emergency steering gear drill requires the engineers to
steer the ship from aft steering while they receive helm
commands from the bridge. At 1300, cadets will have
their quarters inspected by officers for cleanliness to
ensure all belongings are secure.

Captain S. Stephenson